Electricity periodic check at Northney 18th May 5.30am - 9.30am

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

Electricity periodic check at Northney 18th May 5.30am - 9.30am

Jackie Tutt


As a result of the periodic checks and certification of the electricity supply across the Marina, Sureline will need to turn the power off on 18 May 2021 from 05.30 to 09.30 in various parts of the site. This will allow them to complete the NICEIC Certification.